On 9 November 2026, Amazon Freight published a UK peak-season analysis identifying a familiar problem for retailers. Promotional stock is still going into warehouses as early Black Friday orders start coming out. Both flows can need vehicles and loading bays at the same time. If you manage stock across stores, warehouses or fulfilment sites, check which transfers have to arrive before a promotion or dispatch cut-off. Amazon Freight’s peak-season analysis
Plan stock transfers and parcel collections separately
Check your parcel carrier’s peak collection terms before building the dispatch plan. Royal Mail’s business terms say that daily collections during November and December are limited to three times a customer’s usual daily volume outside those months, with existing product-specific limits still applying where relevant. If you expect to exceed a limit, speak to your carrier before the stock is packed and waiting at the bay. Royal Mail’s business terms changes
Make a separate list of stock that has to move between sites. Start with lines at risk of selling out, stock needed for a promotion and anything required to keep a scheduled dispatch running. Ask the receiving site for its latest check-in time and work back from that deadline to a realistic collection window.
Set a trigger for urgent replenishment
Choose in advance when a routine transfer becomes urgent. If a promoted line is likely to sell through before the next scheduled replenishment, decide who can release spare stock, who can authorise the transport and who will receive it.
Dedicated same-day delivery can suit a direct warehouse-to-store transfer with a deadline that falls before the next scheduled run. If stock is ready in the evening and needed for the following morning, check the overnight and next-day courier options against the receiving site’s hours.
Confirm the handover before the vehicle leaves
Give the driver and both sites the same information. Share the collection and delivery postcodes, the latest arrival time, the number and dimensions of cartons or pallets, and any loading access requirements. Confirm who can accept the goods and what to do if the delivery bay is occupied when the vehicle arrives.
Keep Christmas stock movements on the same planning calendar. Amazon Freight’s analysis notes that Black Friday bookings overlap with Christmas planning and that January returns can compete with outbound replenishment for loading time and transport. Before filling every spare slot with promotional stock, check what your December inbound schedule already needs. Amazon Freight’s planning guidance
If a transfer needs its own vehicle, request a courier quote with both postcodes, the load details and the receiving deadline.